2009 (2)

  Day 6

Thu 3 Sep 2009

07:15 Moy Bridge
(W Pontoon)
Both awake and up o / c // rr
08:20 Moy Bridge
(W Pontoon)
Let go for day
09:10 Banavie Basin Stopped for coffee, quick walk down locks to store, and watch steam train past. Turned into very long walk to store (P missed train)
10:50 Banavie Basin Returned 'drowned'
11:00 Banavie Basin Let go, moved up for refuse point, then depart NE
12:00 Moy Swingbridge
12:15 Gairlochy
(W pontoon)
Awaiting passge o / c // rr
12:40 Gairlochy Swingbridge
12:45 - 13:05 Gairlochy Locks
13:15 Gairlochy
(E pontoons)
Stop for lunch
14:10 Gairlochy
(E pontoons)
Resume
15:35 Laggan Locks
(W pontoon)
awaiting passage
15:55 - 16:10 Laggan Locks
16:30 Laggan Swingbridge
16:35 Great Glen Water Park Moored for night. Dinner ashore o / c // rr

Daily totals Miles Locks Hours
  23.10 2 5.50

GPS track


Return to summary     Previous day.     Next day

Valid CSS! Valid HTML4.01 Strict