2009 (2)

  Day 3

Mon 31 Aug 2009

07:00 Dochgarroch Lock
(W pontoon)
T awake so gets up (to far better weather) o / c / a
07:15 Dochgarroch Lock
(W pontoon)
P surfaces, claiming she was awake anyway!
08:10 Dochgarroch Lock
(W pontoon)
Took FW. "Elegance" steams past too fast!
08:30 Dochgarroch Lock
(W pontoon)
Let go for day
08:40 - 08:50 Dochgarroch Lock Once clear of lock, "Elegance" tries to overtake at about 9mph!
09:30 Tomnahurich Swingbridge
09:40 Caley Marina Winded above Muirtown Locks (our limit of navigation)
09:50 Caley Marina Stopped at marina - walked to bottom of flight, took stores
11:00 Caley Marina Resume - now headed SW
11:15 Tomnahurich Swingbridge Moored E pontoon awaiting passage
11:40 Tomnahurich Swingbridge Resume and pass through
11:50 Tomnahurich Swingbridge
(W pontoon)
Stopped - walk into Inverness for lunch and shops c / c / a
15:30 Tomnahurich Swingbridge
(W pontoon)
Back aboard
15:45 Tomnahurich Swingbridge
(W pontoon)
Resume
16:30 Dochgarroch Lock
(E pontoon)
Moored for night o / c / a / ir

Daily totals Miles Locks Hours
  9.20 1 2.92

GPS track


Return to summary     Previous day.     Next day

Valid CSS! Valid HTML4.01 Strict