2005

  Day 14

Tue 26 Apr 2005

06:45 Somerton Mill Bridge Heating on - back to bed   bc / c / a
07:30 Somerton Mill Bridge Up late.
08:30 Somerton Mill Bridge Cast off for day
09:20 SOMERTON DEEP LK(34) 12' 0" <
10:20 AYNHO WEIR LK(33) 1' 0" <
10:40 NELL BRIDGE LK(32) 8' 8" <
11:25 KING'S SUTTON LK(31) 10' 8" <
12:10 GRANT'S LK(30) 9' 6" <     o / d / b / rr
12:30 HADDONS LIFT Br. 173 Moored for lunch
13:15 HADDONS LIFT Br. 173 Resume
14:00 BANBURY LK(29) 5' 10" <
14:15 CASTLE QUAY (Banbury) Stopped for stores
14:35 CASTLE QUAY (Banbury) Resume
15:20 HARDWICK LK(28) 7' 6" <
15:50 BOURTON LK(27) 6' 5" <   Called engineer for heating - same fault
16:20 SLAT MILL LK(26) 8' 0" <
16:55 CROPREDY WHARF Br.153 Moored at agreed point for engineer
18:00 CROPREDY WHARF Br.153   Engineer arrives
19:00 CROPREDY WHARF Br.153 Elect to stay put (too late to continue). Dinner aboard Engineer away - fault not now showing (typical!)
21:00 CROPREDY WHARF Br.153 Early morning planned to catch up lost time. Turn in with books   c / c / a / ir-

Daily totals Miles Locks Hours Ave lm/h
  14.40 9 7.33 3.19

Return to summary     Previous day.     Next day

Valid CSS! Valid HTML4.01 Strict