2010

  Day 9

Fri 2 Apr 2010

06:30 WORDSLEY Jn Sourbridge Br. Heating on
07:30 WORDSLEY Jn Sourbridge Br. Up - No rain (but for how long?)   bc / c / a
08:25 WORDSLEY Jn Sourbridge Br. Cast off for day - rain arrives bang on cue
08:30 STOURBRIDGE BOT LK(16) <
09:20 STOURBRIDGE LK(11) <
10:00 STOURBRIDGE LK(6) <
10:50 STOURBRIDGE TOP LK(1) <
11:40 BLACK DELPH Jn Dudley No.1 Stopped for lunch
12:15 BLACK DELPH Jn Dudley No.1 Resume. Continued onto Dudley No.1 Canal   o / d / w / pr
13:05 DELPH TOP LK(1) >
13:15 MERRYHILL CENTRE Stopped Took stores
14:20 MERRYHILL CENTRE Resume
14:50 BLOWERS GREEN LK >
14:55 PARKHEAD Jn Dudley No.2 Turn right onto Dudley No.2 Canal
15:50 WINDMILL END J. Netherton Stopped Took FW
16:00 WINDMILL END J. Netherton Resume
16:05 NETHERTON TUNNEL (S)
16:40 NETHERTON TUNNEL (N)
16:50 DUDLEY PORT J. BCN Turn left onto BCN Mainline
17:15 FACTORY BOT LK(3) >
17:25 FACTORY TOP LK (1) >
17:30 FACTORY Jn Wolverhampton Level Turn left onto Wolverhampton Level
17:35 TIPTON Jn Dudley No.1 Turn right onto Dudley No.1 Canal
17:45 Black Country Museum Winded at museum
17:50 Black Country Museum Moored for night at Museum. Dinner aboard   c / d / b / pr

Daily totals Miles Locks Hours Ave lm/h
  11.29 23 7.58 4.52

GPS track


Return to summary     Previous day.     Next day

Valid CSS! Valid HTML4.01 Strict